Special cable manufacture · Shanghai Built to drawing · from 100 m

Wind Power

Nacelle, tower and service-lift cable for onshore and offshore turbines.

Turbines combine long vertical cable runs, twisting duty, oil exposure and offshore salt, with service intervals measured in months. Cable for nacelle and tower duty benefits from oil-resistant sheathing, screened pairs for control and condition-monitoring signals, and flexibility that survives low temperature at height — plus, on offshore installations, the salt-spray and UV resistance specified for marine work.

What usually governs cable life here

The requirement that decides how long the cable lasts in this installation — and therefore what we change in the construction.

  • Oil and hydraulic fluid resistance (nacelle duty)
  • Low-temperature flexibility for exposed installations
  • Screened signal pairs for monitoring and control
  • UV and ozone resistance for outdoor runs

How to specify

Constructions

Frequently supplied into wind power

Aerial Work Platform Cable
SQ-AWP-100

Aerial Work Platform Cable

Compact boom bundle for scissor and articulated lifts: power, control and data in one run.

View construction